{"id":70855,"date":"2022-08-24T16:11:16","date_gmt":"2022-08-24T14:11:16","guid":{"rendered":"https:\/\/radioislam.org.za\/a\/?p=70855"},"modified":"2022-08-24T16:11:16","modified_gmt":"2022-08-24T14:11:16","slug":"south-africas-nuclear-sector-has-failed-its-test-the-koeberg-nuclear-plant-life-extension","status":"publish","type":"post","link":"https:\/\/radioislam.org.za\/a\/south-africas-nuclear-sector-has-failed-its-test-the-koeberg-nuclear-plant-life-extension\/","title":{"rendered":"South Africa\u2019s Nuclear Sector Has Failed Its Test: The Koeberg Nuclear Plant Life Extension"},"content":{"rendered":"<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"70856\" data-permalink=\"https:\/\/radioislam.org.za\/a\/south-africas-nuclear-sector-has-failed-its-test-the-koeberg-nuclear-plant-life-extension\/koeberg-power-station-696x522\/\" data-orig-file=\"https:\/\/i0.wp.com\/radioislam.org.za\/a\/wp-content\/uploads\/2022\/08\/koeberg-power-station-696x522-1.jpg?fit=300%2C200&amp;ssl=1\" data-orig-size=\"300,200\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"koeberg-power-station-696&amp;#215;522\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/radioislam.org.za\/a\/wp-content\/uploads\/2022\/08\/koeberg-power-station-696x522-1.jpg?fit=300%2C200&amp;ssl=1\" class=\"alignnone size-full wp-image-70856\" src=\"https:\/\/i0.wp.com\/radioislam.org.za\/a\/wp-content\/uploads\/2022\/08\/koeberg-power-station-696x522-1.jpg?resize=300%2C200&#038;ssl=1\" alt=\"\" width=\"300\" height=\"200\" \/><\/p>\n<p><em>By Neelam Rahim<\/em><\/p>\n<p>As South Africa\u2019s power problems intensify, the country\u2019s only nuclear power plant, Koeberg, has frequently been in the news this year \u2013 for the wrong reasons. Professor of Physics at the University of Johannesburg, Hartmut Winkler, says South Africa\u2019s nuclear sector has failed the test to extend the Koeberg Nuclear plant life. Its operating licence expires in 2024, and its continued operation depends on critical refurbishments and upgrades.<\/p>\n<p><span data-preserver-spaces=\"true\">In a discussion with\u00a0<em>Radio Islam International<\/em>, Professor Hartmut Winkler said the plan was very good. But first, they need to get these upgrades done before 2024, when the license expires.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">According to Prof Winkler, to get this license, they need to install three new steam generators in each one of the units.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">There are two units in Koeberg, and Prof said the plan was to do one unit between January and June. And they were starting the second unit in October into early next year.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">However, when the work started in January, the French company tasked with performing this arrived and found that they couldn\u2019t move ahead. This was because the old steam generators were radioactively contaminated.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">One unit of Koeberg corresponds roughly to one load shedding stage without six months in total, including over July, when we experienced all the worst load shedding. It contributed to that, and now the entire thing will have to be repeated next year, Prof Alex added.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">If Koeberg does not get what needs to be done, this will exacerbate the situation and mean more load shedding.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">According to Prof Alex, we have stage 2 load shedding; without Koeberg, it will become stage 4 load shedding. <\/span><\/p>\n<p>The life extension of Koeberg is part of the National electricity plan. Koeberg was completed in 1984. They had an initial license of 40 years and have known for a while that it\u2019s reaching the end of its life span.<\/p>\n<p>There is the option not to continue at all, and there are groups in the country arguing for that and simply forgetting about Koeberg altogether. Close it down and instead come up with a different capacity, given that this would have to be completed relatively quickly. The only other alternative is to build wind and solar plants.<\/p>\n<p>Listen to the interview on <em>Radio Islam&#8217;s<\/em> podcast below.<\/p>\n<p><iframe loading=\"lazy\" title=\"South Africa\u2019s Nuclear Sector Has Failed Its Test: The Koeberg Nuclear Plant Life Extension by Radio Islam International\" width=\"1080\" height=\"400\" scrolling=\"no\" frameborder=\"no\" src=\"https:\/\/w.soundcloud.com\/player\/?visual=true&#038;url=https%3A%2F%2Fapi.soundcloud.com%2Ftracks%2F1330427437&#038;show_artwork=true&#038;maxheight=1000&#038;maxwidth=1080\"><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Neelam Rahim As South Africa\u2019s power problems intensify, the country\u2019s only nuclear power plant, Koeberg, has frequently been in the news this year \u2013 for the wrong reasons. Professor of Physics at the University of Johannesburg, Hartmut Winkler, says South Africa\u2019s nuclear sector has failed the test to extend the Koeberg Nuclear plant life. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":70856,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[28,31,4995],"tags":[],"class_list":["post-70855","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news","category-podcasts","category-south-africa"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/radioislam.org.za\/a\/wp-content\/uploads\/2022\/08\/koeberg-power-station-696x522-1.jpg?fit=300%2C200&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/pc0QIf-iqP","jetpack_likes_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-04-19 19:53:20","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/posts\/70855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/comments?post=70855"}],"version-history":[{"count":0,"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/posts\/70855\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/media\/70856"}],"wp:attachment":[{"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/media?parent=70855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/categories?post=70855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/radioislam.org.za\/a\/wp-json\/wp\/v2\/tags?post=70855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}